Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · NGET

Shaftesbury Energy Park

Shaftesbury Energy Park is a 100 MW battery storage project consented, connecting to the National Grid (England & Wales) network at Shaftesbury 132kV Substation, with capacity due from December 2036. The connection agreement is held by Tagenergy Development UK Limited.

Project stageConsented
  1. Planning (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingFrom Dec 2036 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-002167
Customer
Tagenergy Development UK Limited
Technology
Energy Storage System
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
6 December 2036
Connection site
Shaftesbury 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Consents Approved

Connection site

The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.

Projects connecting near Shaftesbury · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem