Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETCar Duibh Wind Farm
Car Duibh Wind Farm is a 99 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Car Duibh 275kV Substation, with capacity due from October 2034. The connection agreement is held by Car Duibh Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002342
- Customer
- Car Duibh Wind Farm Limited
- Technology
- Wind Onshore
- Total capacity
- 99 MW
- Change in this agreement
- +99 MW
- Capacity effective from
- 31 October 2034
- Connection site
- Car Duibh 275kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem