Woodheads Energy Park

Woodheads Energy Park is a 100 MW solar + storage project in planning, connecting to the SP Transmission (south Scotland) network at Gala North 400/132kV Substation, with capacity due from April 2033. The connection agreement is held by Abo Energy United Kingdom Ltd.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Apr 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005912
Customer
Abo Energy United Kingdom Ltd
Technology
Energy Storage System, PV Array (Photo Voltaic/solar)
Total capacity
100 MW
Change in this agreement
+100 MW
Capacity effective from
30 April 2033
Connection site
Gala North 400/132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping

Connection site

The connection site could not be placed on the map.

Projects connecting near Gala North · Grid map

Other projects at Gala North 400/132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem