Grid infrastructure › Connection queue › Onshore wind
ONSHORE WIND · SPTBlair Hill Wind Farm
Blair Hill Wind Farm is a 99 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Blair Hill Wind Farm 132Kv Substation, with capacity due from October 2036. The connection agreement is held by Renewable Energy Systems Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2036 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004994
- Customer
- Renewable Energy Systems Limited
- Technology
- Wind Onshore
- Total capacity
- 99 MW
- Change in this agreement
- +99 MW
- Capacity effective from
- 31 October 2036
- Connection site
- Blair Hill Wind Farm 132Kv Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem