BATTERY STORAGE · NGET

Danks Way BESS

Danks Way BESS is a 99 MW battery storage project under construction or commissioning, connecting to the National Grid (England & Wales) network at Ocker Hill C 132kV GSP, with capacity due from October 2026. The connection agreement is held by Ocker Hill BESS Limited.

Project stageUnder construction
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingFrom Oct 2026 (not yet reached)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-006863
Customer
Ocker Hill BESS Limited
Technology
Energy Storage System
Total capacity
99 MW
Change in this agreement
+99 MW
Capacity effective from
31 October 2026
Connection site
Ocker Hill C 132kV GSP
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Under Construction/Commissioning

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Ocker Hill C · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem