Grid infrastructure βΊ Connection queue βΊ Gas
GAS Β· NGETFort Dunlop
Fort Dunlop is a 99 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Dunlop 132kV Substation. The connection agreement is held by Whitetower Energy Limited.
Connection details
- NESO project number
- PRO-000160
- Customer
- Whitetower Energy Limited
- Technology
- OCGT (Open Cycle Gas Turbine)
- Total capacity
- 99 MW
- Already connected
- 99 MW
- Connection site
- Dunlop 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Built
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem