🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Kxp Alpha 3 Ayr BESS

Kxp Alpha 3 Ayr BESS is a 99 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at KXP Alpha 3 Ayr BESS 275kV Substation, with capacity due from October 2037. The connection agreement is held by Kxp Alpha III Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-003672
Customer
Kxp Alpha III Limited
Technology
Energy Storage System
Total capacity
99 MW
Change in this agreement
+99 MW
Capacity effective from
30 October 2037
Connection site
KXP Alpha 3 Ayr BESS 275kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near KXP Alpha · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem