BATTERY STORAGE · SPTForsa Energy Denny BESS
Forsa Energy Denny BESS is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Forsa Energy Denny BESS 132Kv Grid Supply Point Substation, with capacity due from October 2030. The connection agreement is held by Forsa Energy Holdings Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2030 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004971
- Customer
- Forsa Energy Holdings Limited
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 31 October 2030
- Connection site
- Forsa Energy Denny BESS 132Kv Grid Supply Point Substation
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem