Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· SPTMckraw99Mw BESS Bega
Mckraw99Mw BESS Bega is a 100 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Muckraw IDNO GSP, with capacity due from June 2032. The connection agreement is held by Care Power (Muckraw) Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Jun 2032 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-004272
- Customer
- Care Power (Muckraw) Limited
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 30 June 2032
- Connection site
- Muckraw IDNO GSP
- Transmission owner
- SP Transmission (south Scotland)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem