Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETNorwich 100MW BESS
Norwich 100MW BESS is a 100 MW battery storage project in planning, connecting to the National Grid (England & Wales) network at Norwich Main 132kV, with capacity due from October 2031. The connection agreement is held by Flexion Energy Spv 2 Ltd.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Oct 2031 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002126
- Customer
- Flexion Energy Spv 2 Ltd
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Change in this agreement
- +100 MW
- Capacity effective from
- 31 October 2031
- Connection site
- Norwich Main 132kV
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Norwich Main 132kV
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem