πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Gas

GAS Β· NGET

Great Yarmouth

Great Yarmouth is a 420 MW gas project built and connected, connecting to the National Grid (England & Wales) network at Norwich Main 132kV. The connection agreement is held by RWE Generation UK Plc.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000124
Customer
RWE Generation UK Plc
Technology
CCGT (Combined Cycle Gas Turbine)
Total capacity
420 MW
Already connected
420 MW
Connection site
Norwich Main 132kV
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Norwich Main Β· Grid map

Other projects at Norwich Main 132kV

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem