Grid infrastructure βΊ Connection queue βΊ Battery storage
BATTERY STORAGE Β· NGETLakeside Energy Drax
Lakeside Energy Drax is a 100 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Drax 132kV Substation. The connection agreement is held by Lakeside Energy Storage Limited.
Connection details
- NESO project number
- PRO-001522
- Customer
- Lakeside Energy Storage Limited
- Technology
- Energy Storage System
- Total capacity
- 100 MW
- Already connected
- 100 MW
- Connection site
- Drax 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Built
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Drax 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem