ONSHORE WIND Β· SHETBreakish Windfarm
Breakish Windfarm is a 100 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Breakish 132kV Substation, with capacity due from April 2034. The connection agreement is held by Asuk Holdco 2 Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Apr 2034 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002170-2
- Customer
- Asuk Holdco 2 Limited
- Technology
- Wind Onshore
- Total capacity
- 100 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 30 April 2034
- Connection site
- Breakish 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Breakish 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem