Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETBreakish Windfarm
Breakish Windfarm is a 50 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Breakish 132kV Substation, with capacity due from May 2029. The connection agreement is held by Asuk Holdco 2 Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-002170-1
- Customer
- Asuk Holdco 2 Limited
- Technology
- Wind Onshore
- Total capacity
- 50 MW
- Change in this agreement
- +50 MW
- Capacity effective from
- 31 May 2029
- Connection site
- Breakish 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Scoping
- Connections reform gate
- Gate 1
Connection site
The connection site could not be placed on the map.
Other projects at Breakish 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem