Grid connection projects in the connection queue

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown2,255782.1 GW in total
In planning1,590scoping or awaiting consent
Consented or building265closest to connecting
Built400connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

2,255 projects · page 28 of 46
ProjectCapacityStageConnection siteFrom
Knockodhar Wind Farm
Onshore wind · Reg Knockodhar Limited
120 MWScoping Knockodhar Wind Farm 132kV Substation
SP Transmission (south Scotland)
Apr 2028
Lightsource Mon Solar 2
Solar + storage · Lightsource Spv 204 Limited
120 MWScoping Wylfa South 400kV Substation
National Grid (England & Wales)
Nov 2037
Lincomb Farm 120MW BESS Scheme
Battery storage · Fpc Electric Land Limited
120 MWScoping Bishops Wood 132kV Substation
National Grid (England & Wales)
Jun 2033
Middlewick Wind
Onshore wind · Dengie Marshes Wind Farm Limited
120 MWScoping Rayleigh Main GSP
National Grid (England & Wales)
Oct 2034
Pembroke (spare bay)
Battery storage · Pembroke Green Limited
120 MWConsents Approved Pembroke 132kV Substation
National Grid (England & Wales)
Jul 2028
Pigeon House BESS
Battery storage · Voltwise Power Holdings Limited
120 MWScoping Solent Connection Node B 132kV Substation
National Grid (England & Wales)
Oct 2037
Ratcliffe on Soar BESS
Battery storage · Fpc Electric Land Limited
120 MWScoping Kegworth B (Derbyshire Connection Node C) 132kV Substation
National Grid (England & Wales)
Oct 2037
Uskmouth - New Connection
Battery storage · Aw1 Energy Storage Limited
120 MWUnder Construction/Commissioning Uskmouth 132kV Substation
National Grid (England & Wales)
Oct 2026
Vale of Neath (Rhigos Road)
Solar + storage · Elgin Energy Es Co Limited
120 MWScoping Hirwaun GSP
National Grid (England & Wales)
Dec 2036
West Burton
Solar + storage · Enso Green Holdings A Limited
120 MWUnder Construction/Commissioning West Burton 132kV Substation
National Grid (England & Wales)
Jun 2027
Wylfa Substation
Solar + storage · Wylfa Green Limited
120 MWScoping Wylfa 132kV Substation
National Grid (England & Wales)
Jun 2029
Newlands Hill Wind Energy Hub
Wind + storage · Newlands Hill Wind Energy Hub Limited
119 MWAwaiting Consents Newlands Hill 132/33kV
SP Transmission (south Scotland)
Apr 2030
Blacklaw
Wind + storage · Scottish Power Renewables (UK) Limited
118 MWBuilt Blacklaw 132/33kV
SP Transmission (south Scotland)
Culachy Wind Farm
Wind + storage · Fred Olsen Renewables Limited
115 MWScoping Fort Augustus 2 400kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Pencloe Windfarm
Wind + storage · Pencloe Wind Energy Limited
115 MWScoping Pencloe 132/33kV Substation
SP Transmission (south Scotland)
Apr 2028
Arecleoch
Onshore wind · Scottish Power Renewables (UK) Limited
114 MWBuilt Arecleoch 132/33kV
SP Transmission (south Scotland)
Brown Rig Wind Farm
Onshore wind · SSE Renewables Services (UK) Limited
114 MWScoping Hawick 132kV Substation
SP Transmission (south Scotland)
Oct 2033
Cumberhead West Wind Farm
Onshore wind · Cumberhead West Wind Farm Ltd.
114 MWBuilt Cumberhead 33kV
SP Transmission (south Scotland)
Hare Hill Repowering
Onshore wind · Scottish Power Renewables (UK) Limited
114 MWScoping Hare Hill Repowering 132/33kV Substation
SP Transmission (south Scotland)
Oct 2031
Lessnessock Energy Park
Battery storage · Renewco Power Limited
114 MWScoping Lessnessock Energy Park 132Kv Substation
SP Transmission (south Scotland)
Oct 2037
Lethen Wind Farm
Onshore wind · Fred Olsen Renewables Limited
114 MWScoping Lethen Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Dec 2033
Slickly Wind Farm
Wind + storage · Slickly Wind Farm Limited
114 MWConsents Approved Slickly Wind Farm 132kV Substation
SSEN Transmission (north Scotland)
Dec 2029
Coille Linne
Wind + storage · Energyfarm UK Coille Linne Ltd
113 MWScoping Coille Linne 132kV Substation
SSEN Transmission (north Scotland)
Oct 2037
Teindland Wind Farm
Onshore wind · Teindland Wind Farm Limited
112 MWAwaiting Consents Blackhillock substation
SSEN Transmission (north Scotland)
Sep 2029
Colmealie Wind - Solar - BESS Farm
Solar + storage · Galileo 21 Limited
112 MWScoping New Fetteresso 132Kv Substation
SSEN Transmission (north Scotland)
Oct 2037
Euchanhead Wind Farm
Onshore wind · Scottish Power Renewables (UK) Limited
112 MWAwaiting Consents Euchanhead 132kV Substation
SP Transmission (south Scotland)
Oct 2030
Kennoxhead Wind Farm
Onshore wind · Perigus Energy UK Limited
112 MWConsents Approved Coalburn 132kV
SP Transmission (south Scotland)
Apr 2028
Brechfa Dau Wind Farm
Wind + storage · TRYDAN GWYRDD CYMRU (Welsh Government) Ltd
111 MWScoping Llandyfaelog 132kV Substation
National Grid (England & Wales)
Dec 2036
Barry Road Storage
Battery storage · Bsr Applications Limited
110 MWScoping Severn Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2037
Bodelwyddan BESS and PV
Solar + storage · Bodelwyddan Solar & Energy Storage Limited
110 MWScoping Bodelwyddan 400kV Substation
National Grid (England & Wales)
Oct 2029
Merthyr Solar and Battery
Solar · Eew Renewables Ltd
110 MWScoping Cilfynydd 400kV Substation
National Grid (England & Wales)
May 2029
Beinneun Wind Farm
Onshore wind · Beinneun Wind Farm Ltd
109 MWBuilt Beinneun 132kV Substation
SSEN Transmission (north Scotland)
Bhlaraidh Wind Farm
Onshore wind · Sse Generation Limited
108 MWBuilt Bhlaraidh 132/33kV Substation
SSEN Transmission (north Scotland)
Clauchrie Windfarm
Wind + storage · Scottish Power Renewables (UK) Limited
108 MWScoping Clauchrie 132/33KV Substation
SP Transmission (south Scotland)
May 2033
Gordonbush Wind Farm
Onshore wind · Sse Generation Limited
108 MWBuilt Gordonbush GSP
SSEN Transmission (north Scotland)
Grayside Wind Farm
Onshore wind · Grayside Wf Ltd
108 MWScoping REDSHAW 132kV B BOARD SUBSTATION
SP Transmission (south Scotland)
Oct 2037
Gwynt Alwen WF
Solar + storage · Bwlch Gwyn Wind Farm Limited
108 MWScoping North Wales connection Node A 400kV Substation
National Grid (England & Wales)
Jun 2030
Gwynt Alwen WF
Solar + storage · Bwlch Gwyn Wind Farm Limited
108 MWScoping North Wales connection Node A 400kV Substation
National Grid (England & Wales)
Oct 2032
Sandy Knowe Wind Farm
Onshore wind · Sandy Knowe Wind Farm Limited
108 MWAwaiting Consents Sandyknowe 132/33kV
SP Transmission (south Scotland)
Oct 2027
Twyn Hywel Cillfynydd
Onshore wind · Twyn Hywel Energy Park Ltd
108 MWScoping Cilfynydd 400kV Substation
National Grid (England & Wales)
Apr 2027
Bryn Tilti
Onshore wind · Rhiwlas Energy Park Limited
106 MWScoping Chirk GSP
National Grid (England & Wales)
Feb 2027
Limekiln
Wind + storage · Limekiln Extension Limited
106 MWBuilt Limekilns 132/33kV substation
SSEN Transmission (north Scotland)
Achany Extension Wind Farm
Onshore wind · Sse Generation Limited
105 MWAwaiting Consents ACHANY EXTENSION WIND FARM 132/33KV Substation
SSEN Transmission (north Scotland)
Mar 2028
Aultmore Wind Farm (2023)
Wind + storage · Vattenfall Wind Power Ltd
105 MWScoping Aultmore Wind Farm 132/33kV Substation
SSEN Transmission (north Scotland)
Sep 2030
Creag Riabhach Wind Farm
Onshore wind · Creag Riabhach Wind Farm Ltd
105 MWScoping Creag Riabhach 132/33kV Substation
SSEN Transmission (north Scotland)
Jul 2027
Earraghail Renewable Energy Development (formerly Skipness & Corranbuie)
Solar + storage · Scottish Power Renewables (UK) Limited
105 MWScoping Earraghail 275/33KV Substation
SSEN Transmission (north Scotland)
Apr 2031
Eredine Wind Farm
Wind + storage · RWE Renewables UK Onshore Wind Limited
105 MWScoping An Suidhe 275/33kV
SSEN Transmission (north Scotland)
Nov 2029
Fasque Windfarm
Solar · Scottish Power Renewables (UK) Limited
105 MWScoping Fetteresso 132kV substation
SSEN Transmission (north Scotland)
Oct 2031
Kinmuck PV and BESS Station
Solar + storage · Kinmuck Energy Storage Limited
105 MWAwaiting Consents Kinmuck BESS 132kV Substation
SSEN Transmission (north Scotland)
May 2027
Old Stoke Rd BESS
Battery storage · Cubico UK Development Limited
105 MWScoping North Anglia Connection Node A 132kV Substation
National Grid (England & Wales)
Oct 2034
Page 28 of 46

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.