Grid infrastructure › Connection queue › Battery storage
BATTERY STORAGE · NGETUskmouth - New Connection
Uskmouth - New Connection is a 120 MW battery storage project under construction or commissioning, connecting to the National Grid (England & Wales) network at Uskmouth 132kV Substation, with capacity due from October 2026. The connection agreement is held by Aw1 Energy Storage Limited.
Project stageUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingFrom Oct 2026 (not yet reached)
- Closed (not yet reached)
Connection details
- NESO project number
- PRO-001357
- Customer
- Aw1 Energy Storage Limited
- Technology
- Energy Storage System
- Total capacity
- 120 MW
- Change in this agreement
- +120 MW
- Capacity effective from
- 31 October 2026
- Connection site
- Uskmouth 132kV Substation
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Under Construction/Commissioning
- Connections reform gate
- Gate 2
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Other projects at Uskmouth 132kV Substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem