πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Battery storage

BATTERY STORAGE Β· NGET

Uskmouth

Uskmouth is a 350 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Uskmouth 132kV Substation. The connection agreement is held by Uskmouth Energy Storage Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-000220
Customer
Uskmouth Energy Storage Limited
Technology
Energy Storage System
Total capacity
350 MW
Already connected
350 MW
Connection site
Uskmouth 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Direct connection to the transmission network
NESO project status
Built

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Uskmouth Β· Grid map

Other projects at Uskmouth 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem