Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SHET

Teindland Wind Farm

Teindland Wind Farm is a 112 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Blackhillock substation, with capacity due from September 2029. The connection agreement is held by Teindland Wind Farm Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Sep 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-001821
Customer
Teindland Wind Farm Limited
Technology
Demand, Wind Onshore
Total capacity
112 MW
Change in this agreement
+112 MW
Capacity effective from
28 September 2029
Connection site
Blackhillock substation
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Awaiting Consents

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Blackhillock substation Β· Grid map

Other projects at Blackhillock substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem