Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· SHETTeindland Wind Farm
Teindland Wind Farm is a 112 MW onshore wind project in planning, connecting to the SSEN Transmission (north Scotland) network at Blackhillock substation, with capacity due from September 2029. The connection agreement is held by Teindland Wind Farm Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Sep 2029 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001821
- Customer
- Teindland Wind Farm Limited
- Technology
- Demand, Wind Onshore
- Total capacity
- 112 MW
- Change in this agreement
- +112 MW
- Capacity effective from
- 28 September 2029
- Connection site
- Blackhillock substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The marker shows the connection substation, not the project itself, with the transmission network around it.
Projects connecting near Blackhillock substation Β· Grid map
Other projects at Blackhillock substation
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem