Grid infrastructure βΊ Connection queue βΊ Onshore wind
ONSHORE WIND Β· NGETBryn Tilti
Bryn Tilti is a 106 MW onshore wind project in planning, connecting to the National Grid (England & Wales) network at Chirk GSP, with capacity due from February 2027. The connection agreement is held by Rhiwlas Energy Park Limited.
Project stageIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom Feb 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001586
- Customer
- Rhiwlas Energy Park Limited
- Technology
- Wind Onshore
- Total capacity
- 106 MW
- Change in this agreement
- +106 MW
- Capacity effective from
- 4 February 2027
- Connection site
- Chirk GSP
- Transmission owner
- National Grid (England & Wales)
- Connection type
- Embedded (connects through the local distribution network)
- NESO project status
- Scoping
Connection site
The connection site could not be placed on the map.
Other projects at Chirk GSP
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem