Grid infrastructure › Connection queue › Solar + storage
SOLAR + STORAGE · SHETKinmuck PV and BESS Station
Kinmuck PV and BESS Station is a 105 MW solar + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at Kinmuck BESS 132kV Substation, with capacity due from May 2027. The connection agreement is held by Kinmuck Energy Storage Limited.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingFrom May 2027 (not yet reached)
- Closed (not yet reached)
Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.
Connection details
- NESO project number
- PRO-001700
- Customer
- Kinmuck Energy Storage Limited
- Technology
- Energy Storage System, PV Array (Photo Voltaic/solar)
- Total capacity
- 105 MW
- Change in this agreement
- +105 MW
- Capacity effective from
- 31 May 2027
- Connection site
- Kinmuck BESS 132kV Substation
- Transmission owner
- SSEN Transmission (north Scotland)
- Connection type
- Direct connection to the transmission network
- NESO project status
- Awaiting Consents
Connection site
The marker shows the place the connection site is named after, not the project itself, with the transmission network around it.
Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem