πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

Grid infrastructure β€Ί Connection queue β€Ί Wind + storage

WIND + STORAGE Β· SHET

Eredine Wind Farm

Eredine Wind Farm is a 105 MW wind + storage project in planning, connecting to the SSEN Transmission (north Scotland) network at An Suidhe 275/33kV, with capacity due from November 2029. The connection agreement is held by RWE Renewables UK Onshore Wind Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Nov 2029 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-002005
Customer
RWE Renewables UK Onshore Wind Limited
Technology
Energy Storage System, Wind Onshore
Total capacity
105 MW
Change in this agreement
+105 MW
Capacity effective from
1 November 2029
Connection site
An Suidhe 275/33kV
Transmission owner
SSEN Transmission (north Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near An Suidhe Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem