🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Grid infrastructure › Connection queue › Battery storage

BATTERY STORAGE · SPT

Lessnessock Energy Park

Lessnessock Energy Park is a 114 MW battery storage project in planning, connecting to the SP Transmission (south Scotland) network at Lessnessock Energy Park 132Kv Substation, with capacity due from October 2037. The connection agreement is held by Renewco Power Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2037 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-005033
Customer
Renewco Power Limited
Technology
Energy Storage System
Total capacity
114 MW
Change in this agreement
+114 MW
Capacity effective from
30 October 2037
Connection site
Lessnessock Energy Park 132Kv Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The connection site could not be placed on the map.

Projects connecting near Lessnessock Energy Park · Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem