Grid infrastructure β€Ί Connection queue β€Ί Onshore wind

ONSHORE WIND Β· SPT

Brown Rig Wind Farm

Brown Rig Wind Farm is a 114 MW onshore wind project in planning, connecting to the SP Transmission (south Scotland) network at Hawick 132kV Substation, with capacity due from October 2033. The connection agreement is held by SSE Renewables Services (UK) Limited.

Project stageIn planning
  1. Planning (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingFrom Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Scoping and awaiting consents are both shown as planning. A connection agreement does not mean the project will be built: many queue projects never reach construction.

Connection details

NESO project number
PRO-004083
Customer
SSE Renewables Services (UK) Limited
Technology
Wind Onshore
Total capacity
114 MW
Change in this agreement
+114 MW
Capacity effective from
31 October 2033
Connection site
Hawick 132kV Substation
Transmission owner
SP Transmission (south Scotland)
Connection type
Direct connection to the transmission network
NESO project status
Scoping
Connections reform gate
Gate 1

Connection site

The marker shows the connection substation, not the project itself, with the transmission network around it.

Projects connecting near Hawick Β· Grid map

Other projects at Hawick 132kV Substation

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem