United States › Grid › Interconnection queues › California

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in California — page 4

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown464179.2 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

464 requests · page 4 of 10
ProjectCapacityStatusLocationRegionQueuedOnline
Tea Leaf Energy Storage
Battery storage
404 MWIn study Alameda, CACAISO Apr 2023target 2030
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Mount Laguna Wind 2
Onshore wind
400 MWAgreement signed San Diego, CACAISO May 2017target 2031
Other project SC1Q31, Sacramento County
Other
400 MWIn study Sacramento, CAWest Jul 2025target 2032
Driftwood Stella
Solar + storage
400 MWAgreement signed Kern, CACAISO May 2017target 2026
Gamay
Solar + storage
400 MWIn study Kern, CACAISO Apr 2023target 2031
Aratina Solar Center 2
Solar + storage
400 MWAgreement signed Kern, CACAISO Apr 2019target 2026
Sequoia
Solar + storage
400 MWIn study Tulare, CACAISO Apr 2020target 2031
Brushy
Battery storage
400 MWIn study Solano, CACAISO Apr 2021target 2031
Rexford 2 Solar Farm
Solar + storage
400 MWAgreement signed Tulare, CACAISO Apr 2020target 2027
Aratina Solar Center 1
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2026
Sienna Solar Farm
Solar + storage
400 MWAgreement signed San Bernardino, CACAISO Apr 2015target 2027
Comstock
Gas
398 MWIn study San Bernardino, CACAISO Apr 2023target 2028
Battery storage project GI-2023-168, Imperial County
Battery storage
387 MWIn study Imperial, CAWest Apr 2023target 2025
Sonrisa
Solar + storage
384 MWAgreement signed Fresno, CACAISO May 2017target 2026
MidBishop
Solar + storage
382 MWIn study Kings, CACAISO Apr 2023target 2029
Brown Bear
Solar + storage
378 MWIn study Kings, CACAISO Apr 2023target 2029
Luna Valley Solar
Solar + storage
373 MWAgreement signed Fresno, CACAISO Apr 2015target 2028
Circinus
Solar + storage
371 MWIn study Merced, CACAISO Apr 2023target 2031
Golden Flats
Battery storage
365 MWAgreement signed Stanislaus, CACAISO Apr 2021target 2031
Espresso
Battery storage
365 MWAgreement signed Alameda, CACAISO Apr 2021target 2031
Northeast Central Valley
Battery storage
365 MWIn study San Joaquin, CACAISO Apr 2021target 2031
Jewelflower Storage
Battery storage
355 MWAgreement signed Santa Clara, CACAISO Apr 2019target 2029
Allegheny Energy Storage
Battery storage
353 MWAgreement signed Contra Costa, CACAISO Apr 2021target 2032
Bajada
Solar
353 MWIn study Riverside, CACAISO Apr 2023target 2030
Moonraker
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Zama
Battery storage
353 MWIn study Kern, CACAISO Apr 2023target 2029
Argos Solar
Solar
352 MWIn study San Bernardino, CACAISO Apr 2023target 2030
Other project Q91, Los Angeles County
Other
346 MWIn study Los Angeles, CAWest Jun 2022target 2030
Solar + storage project 8, Sacramento County
Solar + storage
344 MWIn study Sacramento, CAWest Jan 2021target 2026
Ariella Solar
Solar + storage
327 MWAgreement signed Tulare, CACAISO Apr 2021target 2030
Spikes Peak Solar
Solar + storage
318 MWAgreement signed Merced, CACAISO Apr 2021target 2029
Galadriel
Battery storage
318 MWIn study Madera, CACAISO Apr 2023target 2031
Quaking Aspen
Solar + storage
318 MWIn study Kern, CACAISO Apr 2023target 2029
Corby
Battery storage
314 MWAgreement signed Solano, CACAISO May 2016target 2027
Cargo Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2036
Haven Storage
Battery storage
313 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Roadhouse Storage
Battery storage
313 MWAgreement signed San Bernardino, CACAISO Apr 2020target 2027
East Field Energy Storage
Battery storage
313 MWAgreement signed San Diego, CACAISO Apr 2020target 2030
Bell Bluff Storage
Battery storage
313 MWIn study San Diego, CACAISO Apr 2021target 2035
Cowboy
Solar + storage
312 MWIn study Colusa, CACAISO Apr 2023target 2030
Key Storage 1
Battery storage
309 MWAgreement signed Fresno, CACAISO Apr 2018target 2026
Harmony Storage 2
Battery storage
308 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Jackrabbit Power Bank
Battery storage
308 MWIn study Santa Clara, CACAISO Apr 2023target 2029
Juniper Storage
Solar + storage
307 MWIn study Los Angeles, CACAISO Apr 2021target 2033
Green Palms
Solar
307 MWIn study Riverside, CACAISO Apr 2023target 2030
Winston Hybrid PV And BESS
Solar + storage
306 MWAgreement signed Kern, CACAISO Apr 2020target 2028
Humidor Storage 1
Battery storage
305 MWAgreement signed Los Angeles, CACAISO Apr 2019target 2028
Gosford Solar Storage
Solar
305 MWIn study Kern, CACAISO Apr 2023target 2029
Gnarly Osage
Battery storage
304 MWIn study San Diego, CACAISO Apr 2021target 2027
Page 4 of 10

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)