United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Juniper Storage

Juniper Storage is a 307 MW solar + storage request in interconnection study in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusIn planning
  1. PlanningQueued Apr 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Feb 2033 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
2061
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Vincent - Pearblossom 230 kV line
Location
Los Angeles County, California
Technology
Solar: 154 MW · Battery: 154 MW
Total requested
307 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
15 April 2021
Proposed online date
February 2033

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem