United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOGaladriel
Galadriel is a 318 MW battery storage request in interconnection study in the CAISO interconnection queue, in Madera County, California, connecting to PGAE.
- PlanningQueued Apr 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2031 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 2297
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- TESLA 230 kV
- Location
- Madera County, California
- Technology
- Battery: 318 MW
- Total requested
- 318 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Active
- Entered queue
- 17 April 2023
- Proposed online date
- March 2031
Location
Marker shows the centre of Madera County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Madera County
- Lotus Solar 2Solar + storage · 406 MW · in study
- Puma StorageBattery storage · 204 MW · in study
- Flores StorageBattery storage · 152 MW · in study
- Valetudo Energy StorageBattery storage · 79.6 MW · in study
- Lotus Solar FarmSolar · 50.0 MW · built
- Chowchilla Solar ProjectSolar · 20.0 MW · built
- Chowchilla BiomassOther · 10.5 MW · built
- Spectrum Energy Storage 2Battery storage · 566 MW · withdrawn
- Delilah Energy Storage 2Battery storage · 300 MW · withdrawn
- TrigoSolar + storage · 230 MW · withdrawn
- IrrigosaSolar + storage · 230 MW · withdrawn
- Madera Solar PV I (Fka Wheeler Ridge Solar PV1)Solar · 220 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem