United States βΊ Grid βΊ Interconnection queues βΊ California
BATTERY STORAGE Β· CAISOSpectrum Energy Storage 2
Spectrum Energy Storage 2 is a 566 MW battery storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 54720
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Q1881 Switching Station on Tesla-Newark #1 230kV
- Location
- California
- Technology
- Battery: 566 MW
- Total requested
- 566 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- March 2031
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Lotus Solar 2Solar + storage Β· 406 MW Β· in study
- GaladrielBattery storage Β· 318 MW Β· in study
- Puma StorageBattery storage Β· 204 MW Β· in study
- Flores StorageBattery storage Β· 152 MW Β· in study
- Valetudo Energy StorageBattery storage Β· 79.6 MW Β· in study
- Lotus Solar FarmSolar Β· 50.0 MW Β· built
- Chowchilla Solar ProjectSolar Β· 20.0 MW Β· built
- Chowchilla BiomassOther Β· 10.5 MW Β· built
- Delilah Energy Storage 2Battery storage Β· 300 MW Β· withdrawn
- TrigoSolar + storage Β· 230 MW Β· withdrawn
- IrrigosaSolar + storage Β· 230 MW Β· withdrawn
- Madera Solar PV I (Fka Wheeler Ridge Solar PV1)Solar Β· 220 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem