OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in the USA — page 320
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project 2010-G1 Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Battery storage project GEN-2019-071, Burt County Battery storage |
51.0 MW | Withdrawn / abandoned |
| Horse Lake Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Buzios Solar - ADD ADDITIONAL MW CAPACITY Solar · Stafford Solar |
51.0 MW | Withdrawn / abandoned |
| Penobscot Mountain WF Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Victoria PV I, LLC Solar · Victoria PV I, LLC |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project J779, Emmons County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2007-031, Lubbock County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project 371, Twin Falls County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Solar + storage project IA-PNM-2019-04, Valencia County Solar + storage |
51.0 MW | Withdrawn / abandoned |
| Solar project 461, Iron County Solar |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project J741, Emmons County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2013-018, Otoe County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project 717, Washington County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Solar project Company 118, Clark County Solar |
51.0 MW | Withdrawn / abandoned |
| Gas project G0575, Grays Harbor County Gas |
51.0 MW | Withdrawn / abandoned |
| Sheffield Solar (Solar Star 1) Solar · Solar Star Texas I (SunPower Corp) |
51.0 MW | Withdrawn / abandoned |
| Glossy Garlic Solar Solar + storage |
51.0 MW | Withdrawn / abandoned |
| Patina Battery storage |
51.0 MW | Withdrawn / abandoned |
| Solar Solar |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project X2-023, Sullivan County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Onshore wind project G0322, Klickitat County Onshore wind |
51.0 MW | Withdrawn / abandoned |
| Solar project AG1-129, Atlantic County Solar |
51.0 MW | Withdrawn / abandoned |
| Brotman Energy Storage Other · WattBridge Energy, LLC |
50.8 MW | Withdrawn / abandoned |
| Storm Solar |
50.8 MW | Withdrawn / abandoned |
| Other project SP108, Pinal County Other |
50.8 MW | Withdrawn / abandoned |
| Onshore wind project AC2-004, Somerset County Onshore wind |
50.8 MW | Withdrawn / abandoned |
| Spruce Ridge Wind Farm Onshore wind |
50.8 MW | Withdrawn / abandoned |
| Bodie Energy Storage Battery storage |
50.7 MW | Withdrawn / abandoned |
| Red-tailed Hawk Solar increase Solar · AP Solar 6, LLC |
50.7 MW | Withdrawn / abandoned |
| Kingston Energy Storage Battery storage |
50.7 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
50.7 MW | Withdrawn / abandoned |
| Montezuma Storage Battery storage · Montezuma Storage LLC |
50.6 MW | Withdrawn / abandoned |
| Pisgah Ridge Storage Other · Duke Energy Renewables Solar, LLC |
50.6 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2013-006, Madison County Onshore wind |
50.6 MW | Withdrawn / abandoned |
| Pisgah Ridge Solar 50MW Solar · Duke Energy Renewables Solar, LLC |
50.6 MW | Withdrawn / abandoned |
| Onshore wind project GEN-2008-088, Oldham County Onshore wind |
50.6 MW | Withdrawn / abandoned |
| Unruh Storage Battery storage · BT Unruh Solar, LLC |
50.5 MW | Withdrawn / abandoned |
| Pruett Storage Battery storage · Crandall Solar LLC |
50.5 MW | Withdrawn / abandoned |
| Solar project IC-492, Houston County Solar |
50.5 MW | Withdrawn / abandoned |
| Peridot Storage Battery storage · BT Castro Storage, LLC |
50.5 MW | Withdrawn / abandoned |
| Apple Hill Energy Storage Battery storage |
50.5 MW | Withdrawn / abandoned |
| Hobbs Energy Storage Battery storage |
50.5 MW | Withdrawn / abandoned |
| Surplus; J1842 Other |
50.4 MW | Withdrawn / abandoned |
| Battery storage project AF2-207, Sussex County Battery storage |
50.4 MW | Withdrawn / abandoned |
| Canvasback II BESS Other · Black Mountain Energy Storage II |
50.4 MW | Withdrawn / abandoned |
| Onshore wind project 1144, Bonneville County Onshore wind |
50.4 MW | Withdrawn / abandoned |
| Franklin Wind Onshore wind · Franklin Wind Farm, LLC |
50.4 MW | Withdrawn / abandoned |
| Solar project 505, Iron County Solar |
50.4 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)