Horse Lake

Horse Lake is a 51.0 MW onshore wind request withdrawn in the CAISO interconnection queue, in Lassen County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedMar 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
878
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Westwood Substation 60kV
Location
Lassen County, California
Technology
Wind: 51.0 MW
Total requested
51.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 April 2012
Proposed online date
December 2013
Withdrawn
March 2013

Location

Marker shows the centre of Lassen County; the queue data does not give exact sites.