United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· SPPOnshore wind project GEN-2007-031, Lubbock County
Onshore wind project GEN-2007-031, Lubbock County is a 51.0 MW onshore wind request withdrawn in the SPP interconnection queue, in Lubbock County, Texas, connecting to SPS.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2007-031
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Location
- Lubbock County, Texas
- Technology
- Wind: 51.0 MW
- Total requested
- 51.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 20 July 2007
- Proposed online date
- December 2008
Location
Marker shows the centre of Lubbock County; the queue data does not give exact sites.
Other requests in Lubbock County
- Dunkel BESSBattery storage Β· 226 MW Β· in study
- Battery storage project GEN-2020-060, Lubbock CountyBattery storage Β· 200 MW Β· in study
- Battery storage project GEN-2024-355, Lubbock CountyBattery storage Β· 199 MW Β· in study
- Staked Plains BESSBattery storage Β· 255 MW Β· suspended
- R MassengaleGas Β· 58.0 MW Β· suspended
- Ty CookeGas Β· 33.0 MW Β· suspended
- BrandonGas Β· 21.0 MW Β· suspended
- Gas project GEN-2011-045, Lubbock CountyGas Β· 205 MW Β· built
- Gas project GEN-2010-006, Lubbock CountyGas Β· 205 MW Β· built
- Gas project GEN-2009-002, Lubbock CountyGas Β· 306 MW Β· withdrawn
- Battery storage project GEN-2022-141, Lubbock CountyBattery storage Β· 250 MW Β· withdrawn
- Battery storage project GEN-2024-356, Lubbock CountyBattery storage Β· 199 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem