United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR + STORAGE Β· CAISOGlossy Garlic Solar
Glossy Garlic Solar is a 51.0 MW solar + storage request withdrawn in the CAISO interconnection queue, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 55035
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- LLAGAS 115 kV
- Location
- California
- Technology
- Solar: 50.0 MW Β· Battery: 1.0 MW
- Total requested
- 51.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Withdrawn
- Entered queue
- 17 April 2023
- Proposed online date
- March 2027
- Withdrawn
- December 2024
Location
Marker shows the centre of County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in County
- Jewelflower StorageBattery storage Β· 355 MW Β· agreement signed
- Tanager StorageBattery storage Β· 200 MW Β· agreement signed
- Ajo Power BankBattery storage Β· 124 MW Β· agreement signed
- Los Esteros Critical Energy Facility ExpansionGas Β· 123 MW Β· agreement signed
- Tokay StorageBattery storage Β· 102 MW Β· agreement signed
- Hummingbird Energy StorageBattery storage Β· 75.0 MW Β· agreement signed
- Jackrabbit Power BankBattery storage Β· 308 MW Β· in study
- Kifer BESS 1Battery storage Β· 50.0 MW Β· in study
- Milpa Power BankBattery storage Β· 3.0 MW Β· in study
- DoloresBattery storage Β· 510 MW Β· withdrawn
- Ada Energy StorageBattery storage Β· 505 MW Β· withdrawn
- CreeksideBattery storage Β· 418 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem