🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Apple Hill Energy Storage

Apple Hill Energy Storage is a 50.5 MW battery storage request withdrawn in the CAISO interconnection queue, in El Dorado County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJun 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1266
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Apple Hill Substation (PGE) 115kV
Location
El Dorado County, California
Technology
Battery: 50.5 MW
Total requested
50.5 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
May 2018
Withdrawn
June 2016

Location

Marker shows the centre of El Dorado County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in El Dorado County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem