United States β€Ί Grid β€Ί Interconnection queues β€Ί California

BATTERY STORAGE Β· CAISO

Newton

Newton is a 61.9 MW battery storage request withdrawn in the CAISO interconnection queue, in El Dorado County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedSep 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1839
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Apple Hill Substation 115 kV
Location
El Dorado County, California
Technology
Battery: 61.9 MW
Total requested
61.9 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
November 2024
Withdrawn
September 2021

Location

Marker shows the centre of El Dorado County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in El Dorado County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem