United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Hobbs Energy Storage

Hobbs Energy Storage is a 50.5 MW battery storage request withdrawn in the CAISO interconnection queue, in Madera County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMay 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1233
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Borden Substation 70kV
Location
Madera County, California
Technology
Battery: 50.5 MW
Total requested
50.5 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
May 2018
Withdrawn
May 2018

Location

Marker shows the centre of Madera County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Madera County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem