🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in the USA — page 308

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown24,2054,519.8 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

24,205 requests · page 308 of 485
ProjectCapacityStatusLocationRegionQueuedOnline
Enbridge Ingleside Storage Cancel
Other · Enbridge Ingleside Solar, LLC
61.9 MWWithdrawn / abandoned San Patricio, TXERCOT target 2025
Newton
Battery storage
61.9 MWWithdrawn / abandoned El Dorado, CACAISO Apr 2021target 2024
Enbridge Ingleside Solar Cancel
Solar · Enbridge Ingleside Solar, LLC
61.9 MWWithdrawn / abandoned San Patricio, TXERCOT target 2025
Enbridge Ingleside Solar SLF
Solar · Enbridge Ingleside Solar, LLC
61.9 MWWithdrawn / abandoned San Patricio, TXERCOT Aug 2022target 2025
Castoria BESS
Battery storage
61.8 MWWithdrawn / abandoned Santa Clara, CACAISO Apr 2023target 2030
OCI SunRoper MW Increase to 24INR0167
Solar · OCI SunRoper LLC
61.6 MWWithdrawn / abandoned Wharton, TXERCOT target 2025
Southern Light Solar
Solar
61.6 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2020
Other project 108, Gulf County
Other · Masked
61.5 MWWithdrawn / abandoned Gulf, FLSoutheast Mar 2011target 2013
Langer Storage
Battery storage · Langer Solar, LLC
61.5 MWWithdrawn / abandoned Bosque, TXERCOT May 2021target 2027
Atria Solar MW addition
Solar · Atria Energy Project, LLC
61.4 MWWithdrawn / abandoned Liberty, TXERCOT target 2023
Gonzaga Ridge Wind Farm 2
Onshore wind
61.3 MWWithdrawn / abandoned Merced, CACAISO Apr 2018target 2020
Onshore wind project 963, Gilliam County
Onshore wind
61.2 MWWithdrawn / abandoned Gilliam, ORWest Oct 2017target 2020
Quantum Increase
Solar · IP Quantum
61.2 MWWithdrawn / abandoned Haskell, TXERCOT May 2019target 2021
Onshore wind project J119, Chippewa County
Onshore wind
61.2 MWWithdrawn / abandoned Chippewa, MIMISO Mar 2010target 2011
Radian Increase
Solar · IP Radian, LLC
61.2 MWWithdrawn / abandoned Brown, TXERCOT May 2019target 2021
Tres Margaritas Solar
Solar · Gransolar Texas Six, LLC
61.0 MWWithdrawn / abandoned Dimmit, TXERCOT Jul 2021target 2026
Cedar Bayou
Gas · Cedar Bayou Cogeneration Company
61.0 MWWithdrawn / abandoned ERCOT Aug 2006target 2050
Jenson
Solar + storage
61.0 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Solar project 634, Leake County
Solar
61.0 MWWithdrawn / abandoned Leake, MSSoutheast Jul 2024
Solar project J2633, Van Buren County
Solar
61.0 MWWithdrawn / abandoned Van Buren, ARMISO Sep 2022target 2025
Solar project AF2-228, York County
Solar
61.0 MWWithdrawn / abandoned York, PAPJM Mar 2020target 2023
Solar project AG2-591, Mahoning County
Solar
61.0 MWWithdrawn / abandoned Mahoning, OHPJM Mar 2021target 2024
Solar + storage project AG2-159, Grant County
Solar + storage · Round Trip, LLC
61.0 MWWithdrawn / abandoned Grant, KYPJM Mar 2025target 2023
Mango Solar
Solar
61.0 MWWithdrawn / abandoned Fresno, CACAISO May 2016target 2018
Rosie Solar
Solar · Industrial Delta Project LLC
61.0 MWWithdrawn / abandoned Winkler, TXERCOT Nov 2022target 2026
Solar project 486, Logan County
Solar
61.0 MWWithdrawn / abandoned Logan, KYSoutheast Mar 2021
Onshore wind project W1-015
Onshore wind
60.8 MWWithdrawn / abandoned PAPJM Feb 2010target 2013
DHS Oasis Solar
Solar
60.8 MWWithdrawn / abandoned Riverside, CACAISO May 2016target 2019
Bluebonnet Solar
Solar · One Energy Renewables
60.7 MWWithdrawn / abandoned Brewster, TXERCOT Jul 2016target 2022
NYC #1
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2015
TGDV #1
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2012
TGDV#2
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2013
Dixie Meadows #1
Geothermal
60.7 MWWithdrawn / abandoned Churchill, NVCAISO May 2008target 2016
Robin Solar Hybrid
Solar + storage
60.5 MWWithdrawn / abandoned Monterey, CACAISO Apr 2019target 2022
Jacumba Ranch
Solar + storage
60.3 MWWithdrawn / abandoned San Diego, CACAISO Apr 2015target 2021
Solar project AG2-214, Charlotte County
Solar
60.2 MWWithdrawn / abandoned Charlotte, VAPJM Mar 2021target 2025
Black Tulip Storage
Battery storage · Black Tulip Energy, LLC
60.0 MWWithdrawn / abandoned Cambria, PAPJM Sep 2021target 2024
Solar project IC-380, Twiggs County
Solar
60.0 MWWithdrawn / abandoned Twiggs, GASoutheast May 2014
Solar project W3-018, Salem County
Solar
60.0 MWWithdrawn / abandoned Salem, NJPJM Aug 2010target 2011
Gas project GEN-2015-019, Franklin County
Gas
60.0 MWWithdrawn / abandoned Franklin, ARSPP Mar 2015target 2017
Solar project J1212, Murray County
Solar
60.0 MWWithdrawn / abandoned Murray, MNMISO Apr 2019target 2023
Solar project J716, Jefferson Davis Parish County
Solar
60.0 MWWithdrawn / abandoned Jefferson Davis Parish, LAMISO Sep 2016target 2019
Wild Horse Wind Farm 1
Onshore wind · Wild Horse Wind Farm I, LLC
60.0 MWWithdrawn / abandoned ERCOT Jul 2002target 2050
Winding Ridge Wind Farm
Onshore wind
60.0 MWWithdrawn / abandoned Garrett, MDPJM Feb 2012target 2017
Gillie Brook
Solar · ACE DevCo NC, LLC
60.0 MWWithdrawn / abandoned Onondaga, NYNYISO Sep 2024
Solar project AF1-115, Surry County
Solar
60.0 MWWithdrawn / abandoned Surry, VAPJM Sep 2019target 2021
Gas project A50, Hudson County
Gas
60.0 MWWithdrawn / abandoned Hudson, NJPJM Feb 1999target 2005
Spring Creek Wind
Onshore wind · DKRW Wind, LLC
60.0 MWWithdrawn / abandoned ERCOT Jan 2009target 2050
Solar project AE2-215, Perry County
Solar
60.0 MWWithdrawn / abandoned Perry, PAPJM Mar 2019target 2021
Wind
Onshore wind
60.0 MWWithdrawn / abandoned Caledonia, VTISO-NE Jan 2012target 2015
Page 308 of 485

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)