United States βΊ Grid βΊ Interconnection queues βΊ Mississippi
SOLAR Β· SOUTHEASTSolar project 634, Leake County
Solar project 634, Leake County is a 61.0 MW solar request withdrawn in the Southeast interconnection queue, in Leake County, Mississippi, connecting to Tennessee Valley Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 634
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Tennessee Valley Authority
- Location
- Leake County, Mississippi
- Technology
- Solar: 61.0 MW
- Total requested
- 61.0 MW
- Queue status
- Withdrawn
- Entered queue
- 2 July 2024
Location
Marker shows the centre of Leake County; the queue data does not give exact sites.
Power plants in Mississippi Β· Transmission lines in Mississippi
Other requests in Leake County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem