United States › Grid › Interconnection queues › California

ONSHORE WIND · CAISO

Gonzaga Ridge Wind Farm 2

Gonzaga Ridge Wind Farm 2 is a 61.3 MW onshore wind request withdrawn in the CAISO interconnection queue, in Merced County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedApr 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1475
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Los Banos Substation 70kV
Location
Merced County, California
Technology
Wind: 61.3 MW
Total requested
61.3 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
16 April 2018
Proposed online date
December 2020
Withdrawn
April 2019

Location

Marker shows the centre of Merced County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Merced County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem