United States › Grid › Interconnection queues › California

SOLAR + STORAGE · CAISO

Robin Solar Hybrid

Robin Solar Hybrid is a 60.5 MW solar + storage request withdrawn in the CAISO interconnection queue, in Monterey County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedJul 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1579
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Soledad Substation 60kV
Location
Monterey County, California
Technology
Solar: 30.3 MW · Battery: 30.3 MW
Total requested
60.5 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
December 2022
Withdrawn
July 2019

Location

Marker shows the centre of Monterey County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Monterey County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem