United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISORockfish Storage 1
Rockfish Storage 1 is a 510 MW battery storage request withdrawn in the CAISO interconnection queue, in Monterey County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1486
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Moss Landing 230kV
- Location
- Monterey County, California
- Technology
- Battery: 510 MW
- Total requested
- 510 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 16 April 2018
- Proposed online date
- December 2023
- Withdrawn
- March 2019
Location
Marker shows the centre of Monterey County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Monterey County
- HolmanWind + storage · 2,282 MW · agreement signed
- Irving StorageBattery storage · 783 MW · agreement signed
- AntliaBattery storage · 205 MW · in study
- El Rey Power BankBattery storage · 124 MW · in study
- Dallas Energy StorageBattery storage · 500 MW · built
- Plano StorageBattery storage · 365 MW · built
- California Flats SolarSolar + storage · 340 MW · built
- Elkhorn Energy StorageBattery storage · 189 MW · built
- Angel Energy CenterBattery storage · 615 MW · withdrawn
- Rockfish Storage 2Battery storage · 510 MW · withdrawn
- WildhorseOnshore wind · 210 MW · withdrawn
- Monterey WindOnshore wind · 150 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem