United States › Grid › Interconnection queues › Pennsylvania

BATTERY STORAGE · PJM

Black Tulip Storage

Black Tulip Storage is a 60.0 MW battery storage request withdrawn in the PJM interconnection queue, in Cambria County, Pennsylvania, connecting to PENELEC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-462
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Developer
Black Tulip Energy, LLC
Connection point (POI)
Rachel Hill 115 kV
Location
Cambria County, Pennsylvania
Technology
Battery: 60.0 MW
Total requested
60.0 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
11 September 2021
Proposed online date
December 2024
Withdrawn
February 2025

Location

Marker shows the centre of Cambria County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Cambria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem