United States › Grid › Interconnection queues › Pennsylvania

ONSHORE WIND · PJM

Onshore wind project AH2-292, Cambria County

Onshore wind project AH2-292, Cambria County is a 77.0 MW onshore wind request in interconnection study in the PJM interconnection queue, in Cambria County, Pennsylvania, connecting to PENELEC.

Queue statusIn planning
  1. PlanningQueued Mar 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AH2-292
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
Bear Rock 230 kV
Location
Cambria County, Pennsylvania
Technology
Wind: 77.0 MW
Total requested
77.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Active
Entered queue
10 March 2022
Proposed online date
December 2025

Location

Marker shows the centre of Cambria County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Cambria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem