United States βΊ Grid βΊ Interconnection queues βΊ Ohio
SOLAR Β· PJMSolar project AG2-591, Mahoning County
Solar project AG2-591, Mahoning County is a 61.0 MW solar request withdrawn in the PJM interconnection queue, in Mahoning County, Ohio, connecting to ATSI.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-591
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ATSI
- Connection point (POI)
- Bluebell-Sancap Tap 69 kV
- Location
- Mahoning County, Ohio
- Technology
- Solar: 61.0 MW
- Total requested
- 61.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2021
- Proposed online date
- June 2024
- Withdrawn
- December 2024
Location
Marker shows the centre of Mahoning County; the queue data does not give exact sites.
Other requests in Mahoning County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem