United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Withdrawn queue requests in ERCOT (Texas) — page 11

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,158262.0 GW
Active in queue447.3 GW1,986 requests
Agreement signed119.3 GW578 requests
Withdrawn1,158262.0 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,158 requests · page 11 of 24
ProjectCapacityStatusLocationRegionQueuedOnline
Delilah Solar 3
Solar
200 MWWithdrawn / abandoned Lamar, TXERCOT Jun 2020
Equinox Solar 2
Solar · Invenergy Solar Project Development LLC
200 MWWithdrawn / abandoned Starr, TXERCOT Dec 2018target 2026
Mockingbird Solar
Solar · Lincoln Clean Energy Development
200 MWWithdrawn / abandoned Hill, TXERCOT Aug 2019target 2021
WIT Ranch Wind
Onshore wind · Eon
200 MWWithdrawn / abandoned ERCOT Sep 2014target 2019
Hariana Solar
Solar · 8minutenergy
200 MWWithdrawn / abandoned ERCOT Dec 2016target 2021
Prairie Point Wind
Onshore wind · Nextera
200 MWWithdrawn / abandoned Grayson, TXERCOT Aug 2018target 2021
Chiltepin Solar
Solar · Chiltepin Solar-Storage, LLC
200 MWWithdrawn / abandoned ERCOT Apr 2021target 2025
Cottonwood Bayou Solar II
Solar · Cottonwood Bayou Solar, LLC
200 MWWithdrawn / abandoned Brazoria, TXERCOT Dec 2018target 2024
Tuxedo I
Onshore wind · Arranz Wind Tuxedo I,LLC
200 MWWithdrawn / abandoned ERCOT Aug 2010target 2013
Brangus Storage
Other · 245CK 8me LLC
200 MWWithdrawn / abandoned Kinney, TXERCOT Jan 2020target 2023
CPV Steele Hill WindFarm
Onshore wind · CPV Renewable Energy LLC
200 MWWithdrawn / abandoned ERCOT Mar 2008
Mustang Draw Solar
Solar · Lincoln Clean
200 MWWithdrawn / abandoned ERCOT Mar 2015target 2016
Byers Wind
Onshore wind · Innergex
200 MWWithdrawn / abandoned ERCOT Nov 2016target 2019
Saltgrass Wind Ph 1
Onshore wind · Duke Energy Generation Services
200 MWWithdrawn / abandoned ERCOT Apr 2008
Robles Solar
Solar · Cypress Creek Renewables
200 MWWithdrawn / abandoned Dimmit, TXERCOT Jul 2018target 2020
Shorthorn Solar
Solar · 8minutenergy
200 MWWithdrawn / abandoned ERCOT Jun 2016target 2020
Torrecillas Wind B
Onshore wind · Nextera
200 MWWithdrawn / abandoned ERCOT Jan 2013target 2018
Lacy Creek Wind Phase 1
Onshore wind
200 MWWithdrawn / abandoned Glasscock, TXERCOT Aug 2018
Seaside Solar
Solar · Seadrift Solar
200 MWWithdrawn / abandoned Calhoun, TXERCOT Dec 2020target 2024
Live Oak
Onshore wind · AES SeaWest
200 MWWithdrawn / abandoned ERCOT Jan 2007target 2050
Corriente Solar
Solar · 8 Minute Energy
200 MWWithdrawn / abandoned ERCOT Dec 2016target 2019
Buffalo Wind 2
Onshore wind · National Renewable Solutions
199 MWWithdrawn / abandoned ERCOT Jan 2014target 2017
Dark Lark Solar
Solar
198 MWWithdrawn / abandoned Henderson, TXERCOT Jun 2022
Watusi Solar
Solar · Cypress Creek Renewables
195 MWWithdrawn / abandoned ERCOT Nov 2017target 2020
M Bar Wind
Onshore wind · Penn Real Estate Group, LTD
194 MWWithdrawn / abandoned ERCOT Jan 2007
Noor Solar
Solar · Industrial Kilo Project LLC
188 MWWithdrawn / abandoned Liberty, TXERCOT Oct 2023target 2028
Hopkins BESS
Other · Hopkins Energy, LLC
188 MWWithdrawn / abandoned Hopkins, TXERCOT Nov 2020target 2023
Grandview W 3
Onshore wind · Eon
188 MWWithdrawn / abandoned ERCOT Mar 2009target 2019
Delta Lake Irrigation District 1 Solar
Solar · Mestenas Floating Solar LLC
187 MWWithdrawn / abandoned Hidalgo, TXERCOT May 2023target 2027
Airtricity Venado Wind Energy Project
Onshore wind · Airtricity, Inc
183 MWWithdrawn / abandoned ERCOT May 2006target 2050
Airtricity Lamesa Wind Plant
Onshore wind · Flying Cloud LLC
183 MWWithdrawn / abandoned ERCOT Jan 2006target 2050
Flatland Solar Project
Solar · Flatland Solar Project, LLC
182 MWWithdrawn / abandoned ERCOT May 2021target 2025
Flatland Solar
Solar · Sunfinity Renewables
182 MWWithdrawn / abandoned Scurry, TXERCOT Oct 2017target 2023
Altita Solar
Solar · ACE DevCo NC, LLC
182 MWWithdrawn / abandoned ERCOT Feb 2024target 2028
Half Moon Solar (supsended)
Solar · Nextera
181 MWWithdrawn / abandoned Hidalgo, TXERCOT Sep 2018target 2028
CountySeat
Gas · LCRA
181 MWWithdrawn / abandoned Bastrop, TXERCOT Nov 2021target 2026
Bacon Switch Solar
Solar · SunChase Power
180 MWWithdrawn / abandoned Wichita, TXERCOT Oct 2017target 2022
Ponwar Solar Farm
Solar · 8minutenergy
180 MWWithdrawn / abandoned Upton, TXERCOT Apr 2016target 2021
Brady Wind
Onshore wind · Invenergy
180 MWWithdrawn / abandoned ERCOT Feb 2007target 2050
SP-Pecos Bend Solar C
Solar · Solar Prime
180 MWWithdrawn / abandoned Pecos, TXERCOT Oct 2016target 2020
MexiAlta
Solar · Greenfields Solar LLC
180 MWWithdrawn / abandoned Limestone, TXERCOT Jun 2021target 2023
Val Verde Wind A
Onshore wind · Akuo Energy USA
180 MWWithdrawn / abandoned ERCOT Jan 2010target 2016
SP-Pecos Bend Solar B
Solar · Solar Prime
180 MWWithdrawn / abandoned Pecos, TXERCOT Oct 2016target 2021
Clarion Solar
Solar · IBV Energy Partners LLC
180 MWWithdrawn / abandoned Medina, TXERCOT Feb 2021target 2024
Beaver Point Windfarm
Onshore wind · FPL Energy, LLC
180 MWWithdrawn / abandoned ERCOT Dec 2005target 2050
Knickerbocker Storage II
Other · San Angelo Solar 2 LLC
178 MWWithdrawn / abandoned Tom Green, TXERCOT Feb 2022target 2025
Brackens Solar
Solar · Brackens Solar
177 MWWithdrawn / abandoned Freestone, TXERCOT May 2023target 2027
Brushy Creek Solar SLF
Solar · Brushy Creek Solar LLC
177 MWWithdrawn / abandoned ERCOT Jan 2019target 2028
Dillon Gulch Wind
Onshore wind · AES
175 MWWithdrawn / abandoned Nolan, TXERCOT Apr 2018target 2020
Buffalo Gap 4
Onshore wind · AES
175 MWWithdrawn / abandoned Nolan, TXERCOT Oct 2017target 2020
Page 11 of 24

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)