OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) — page 11
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Delilah Solar 3 Solar |
200 MW | Withdrawn / abandoned |
| Equinox Solar 2 Solar · Invenergy Solar Project Development LLC |
200 MW | Withdrawn / abandoned |
| Mockingbird Solar Solar · Lincoln Clean Energy Development |
200 MW | Withdrawn / abandoned |
| WIT Ranch Wind Onshore wind · Eon |
200 MW | Withdrawn / abandoned |
| Hariana Solar Solar · 8minutenergy |
200 MW | Withdrawn / abandoned |
| Prairie Point Wind Onshore wind · Nextera |
200 MW | Withdrawn / abandoned |
| Chiltepin Solar Solar · Chiltepin Solar-Storage, LLC |
200 MW | Withdrawn / abandoned |
| Cottonwood Bayou Solar II Solar · Cottonwood Bayou Solar, LLC |
200 MW | Withdrawn / abandoned |
| Tuxedo I Onshore wind · Arranz Wind Tuxedo I,LLC |
200 MW | Withdrawn / abandoned |
| Brangus Storage Other · 245CK 8me LLC |
200 MW | Withdrawn / abandoned |
| CPV Steele Hill WindFarm Onshore wind · CPV Renewable Energy LLC |
200 MW | Withdrawn / abandoned |
| Mustang Draw Solar Solar · Lincoln Clean |
200 MW | Withdrawn / abandoned |
| Byers Wind Onshore wind · Innergex |
200 MW | Withdrawn / abandoned |
| Saltgrass Wind Ph 1 Onshore wind · Duke Energy Generation Services |
200 MW | Withdrawn / abandoned |
| Robles Solar Solar · Cypress Creek Renewables |
200 MW | Withdrawn / abandoned |
| Shorthorn Solar Solar · 8minutenergy |
200 MW | Withdrawn / abandoned |
| Torrecillas Wind B Onshore wind · Nextera |
200 MW | Withdrawn / abandoned |
| Lacy Creek Wind Phase 1 Onshore wind |
200 MW | Withdrawn / abandoned |
| Seaside Solar Solar · Seadrift Solar |
200 MW | Withdrawn / abandoned |
| Live Oak Onshore wind · AES SeaWest |
200 MW | Withdrawn / abandoned |
| Corriente Solar Solar · 8 Minute Energy |
200 MW | Withdrawn / abandoned |
| Buffalo Wind 2 Onshore wind · National Renewable Solutions |
199 MW | Withdrawn / abandoned |
| Dark Lark Solar Solar |
198 MW | Withdrawn / abandoned |
| Watusi Solar Solar · Cypress Creek Renewables |
195 MW | Withdrawn / abandoned |
| M Bar Wind Onshore wind · Penn Real Estate Group, LTD |
194 MW | Withdrawn / abandoned |
| Noor Solar Solar · Industrial Kilo Project LLC |
188 MW | Withdrawn / abandoned |
| Hopkins BESS Other · Hopkins Energy, LLC |
188 MW | Withdrawn / abandoned |
| Grandview W 3 Onshore wind · Eon |
188 MW | Withdrawn / abandoned |
| Delta Lake Irrigation District 1 Solar Solar · Mestenas Floating Solar LLC |
187 MW | Withdrawn / abandoned |
| Airtricity Venado Wind Energy Project Onshore wind · Airtricity, Inc |
183 MW | Withdrawn / abandoned |
| Airtricity Lamesa Wind Plant Onshore wind · Flying Cloud LLC |
183 MW | Withdrawn / abandoned |
| Flatland Solar Project Solar · Flatland Solar Project, LLC |
182 MW | Withdrawn / abandoned |
| Flatland Solar Solar · Sunfinity Renewables |
182 MW | Withdrawn / abandoned |
| Altita Solar Solar · ACE DevCo NC, LLC |
182 MW | Withdrawn / abandoned |
| Half Moon Solar (supsended) Solar · Nextera |
181 MW | Withdrawn / abandoned |
| CountySeat Gas · LCRA |
181 MW | Withdrawn / abandoned |
| Bacon Switch Solar Solar · SunChase Power |
180 MW | Withdrawn / abandoned |
| Ponwar Solar Farm Solar · 8minutenergy |
180 MW | Withdrawn / abandoned |
| Brady Wind Onshore wind · Invenergy |
180 MW | Withdrawn / abandoned |
| SP-Pecos Bend Solar C Solar · Solar Prime |
180 MW | Withdrawn / abandoned |
| MexiAlta Solar · Greenfields Solar LLC |
180 MW | Withdrawn / abandoned |
| Val Verde Wind A Onshore wind · Akuo Energy USA |
180 MW | Withdrawn / abandoned |
| SP-Pecos Bend Solar B Solar · Solar Prime |
180 MW | Withdrawn / abandoned |
| Clarion Solar Solar · IBV Energy Partners LLC |
180 MW | Withdrawn / abandoned |
| Beaver Point Windfarm Onshore wind · FPL Energy, LLC |
180 MW | Withdrawn / abandoned |
| Knickerbocker Storage II Other · San Angelo Solar 2 LLC |
178 MW | Withdrawn / abandoned |
| Brackens Solar Solar · Brackens Solar |
177 MW | Withdrawn / abandoned |
| Brushy Creek Solar SLF Solar · Brushy Creek Solar LLC |
177 MW | Withdrawn / abandoned |
| Dillon Gulch Wind Onshore wind · AES |
175 MW | Withdrawn / abandoned |
| Buffalo Gap 4 Onshore wind · AES |
175 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)