United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in California — page 10
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar + storage project GI-2022-158, Imperial County Solar + storage |
35.0 MW | In study |
| Gas project GI-2025-179, Imperial County Gas |
34.8 MW | In study |
| Escondido Energy Center 2 Battery storage |
33.0 MW | Agreement signed |
| Geothermal project GI-2023-177, Imperial County Geothermal |
33.0 MW | In study |
| Hidden Knolls BESS Battery storage |
30.8 MW | In study |
| Other project GI-2021-144, Imperial County Other |
28.0 MW | In study |
| Solar + storage project T2-078, Modoc County Solar + storage |
24.9 MW | In study |
| Dynamo Solar Solar |
24.5 MW | Agreement signed |
| Separator Expansion Battery storage |
12.6 MW | In study |
| Lake Alpaugh Battery Storage Battery storage |
10.0 MW | Agreement signed |
| Altamont Midway LTD Onshore wind |
5.0 MW | Agreement signed |
| Lassen Lodge Hydroelectric Hydro |
4.5 MW | Agreement signed |
| Milpa Power Bank Battery storage |
3.0 MW | In study |
| Lassen Lodge Hydroelectric 2 Hydro |
0.5 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)