United States › Grid › Interconnection queues › California
SOLAR + STORAGE · WESTSolar + storage project T2-078, Modoc County
Solar + storage project T2-078, Modoc County is a 24.9 MW solar + storage request in interconnection study in the West interconnection queue, in Modoc County, California, connecting to PacifiCorp.
- PlanningQueued Sep 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- T2-078
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Alturas - Mile Hi transmission line
- Location
- Modoc County, California
- Technology
- Solar: 24.9 MW · Battery
- Total requested
- 24.9 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 12 September 2025
- Proposed online date
- December 2026
Location
Marker shows the centre of Modoc County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Modoc County
- Solar + storage project G0868, Modoc CountySolar + storage · 400 MW · withdrawn
- AES Pacific IncOther · 300 MW · withdrawn
- Solar project G0547, Modoc CountySolar · 80.0 MW · withdrawn
- Solar + storage project 1160, Modoc CountySolar + storage · 60.0 MW · withdrawn
- Solar + storage project C1-41, Modoc CountySolar + storage · 60.0 MW · withdrawn
- Solar + storage project TCS-42, Modoc CountySolar + storage · 60.0 MW · withdrawn
- Cal GeoGeothermal · 30.0 MW · withdrawn
- Solar + storage project C4-112, Modoc CountySolar + storage · 24.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem