πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR + STORAGE Β· WEST

Solar + storage project 1160, Modoc County

Solar + storage project 1160, Modoc County is a 60.0 MW solar + storage request withdrawn in the West interconnection queue, in Modoc County, California, connecting to PacifiCorp.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1160
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Connection point (POI)
Alturas-Hornet transmission line
Location
Modoc County, California
Technology
Solar: 60.0 MW Β· Battery
Total requested
60.0 MW
Service type
NRIS and ERIS
Study phase
Request moved to transition cluster
Queue status
Withdrawn
Entered queue
17 September 2019
Proposed online date
December 2023

Location

Marker shows the centre of Modoc County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Modoc County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem