GEOTHERMAL · WEST

Geothermal project GI-2023-177, Imperial County

Geothermal project GI-2023-177, Imperial County is a 33.0 MW geothermal request in interconnection study in the West interconnection queue, in Imperial County, California, connecting to Imperial Irrigation District.

Queue statusIn planning
  1. PlanningQueued Apr 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-2023-177
Grid region
West (non-ISO utilities)
Utility / transmission owner
Imperial Irrigation District
Connection point (POI)
92kV Heber Substation
Location
Imperial County, California
Technology
Geothermal: 33.0 MW
Total requested
33.0 MW
Study phase
In Progress (unknown study)
Queue status
Active
Entered queue
30 April 2023
Proposed online date
September 2026

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Imperial County