Gas project GI-2025-179, Imperial County

Gas project GI-2025-179, Imperial County is a 34.8 MW gas request in interconnection study in the West interconnection queue, in Imperial County, California, connecting to Imperial Irrigation District.

Queue statusIn planning
  1. PlanningQueued Feb 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-2025-179
Grid region
West (non-ISO utilities)
Utility / transmission owner
Imperial Irrigation District
Connection point (POI)
ECSS 92kV Bay 1
Location
Imperial County, California
Technology
Gas: 34.8 MW
Total requested
34.8 MW
Study phase
Cluster Study
Queue status
Active
Entered queue
7 February 2025
Proposed online date
September 2027

Location

Marker shows the centre of Imperial County; the queue data does not give exact sites.