🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

Home › Grid infrastructure › Connection queue

NESO TEC REGISTER · GREAT BRITAIN

Battery storage projects in the connection queue on the National Grid (England & Wales) network

Every generator, battery and interconnector with an agreement to connect to the GB transmission network, from early scoping to built. Filter by technology, stage or network, and open a project for its connection details.

Projects shown6612.5 GW in total
In planning360scoping or awaiting consent
Consented or building77closest to connecting
Built66connected and operating

Map

Loading projects…

Voltage400 kV275 kV132 kVHVDCNew HVAC

ProjectsPlanningConsentedConstructionBuiltMajor project with its own page

Projects

66 projects · page 1 of 2
ProjectCapacityStageConnection siteFrom
West Burton B
Battery storage · West Burton B Limited
1.9 GWBuilt West Burton 400kV Substation
National Grid (England & Wales)
Oct 2034
West Burton B
Battery storage · West Burton B Limited
1.8 GWBuilt West Burton 400kV Substation
National Grid (England & Wales)
Oct 2027
Didcot B
Battery storage · RWE Generation UK Plc
1.7 GWBuilt Didcot 400kV Substation
National Grid (England & Wales)
Oct 2037
Immingham
Battery storage · Vpi Immingham LLP
1.3 GWBuilt Humber Refinery 400kV Substation
National Grid (England & Wales)
Thurrock Power Station
Battery storage · Thurrock Flexible Generation Limited
750 MWBuilt Tilbury 275kV Substation
National Grid (England & Wales)
Jun 2026
Little Barford
Battery storage · RWE Generation UK Plc
740 MWBuilt Eaton Socon 400kV Substation
National Grid (England & Wales)
Uskmouth
Battery storage · Uskmouth Energy Storage Limited
350 MWBuilt Uskmouth 132kV Substation
National Grid (England & Wales)
Welbar Energy Storage
Battery storage · Welbar Energy Storage Limited
350 MWBuilt Hams Hall 400kV Substation
National Grid (England & Wales)
Thurrock Power Station
Battery storage · Thurrock Flexible Generation Limited
300 MWBuilt Tilbury 275kV Substation
National Grid (England & Wales)
Spalding Energy Expansion
Battery storage · Spalding Energy Expansion Limited
300 MWBuilt Spalding North 400kV Substation
National Grid (England & Wales)
Ratcliffe on Soar
Battery storage · Uniper UK Limited
225 MWBuilt Ratcliffe-On-Soar 400kV Substation
National Grid (England & Wales)
Deeside Power Station
Battery storage · Deeside Power (UK) Limited
190 MWBuilt Connah's Quay 400kV Substation
National Grid (England & Wales)
Oct 2026
SSE Ferrybridge BESS
Battery storage · Sse Battery Salisbury Limited
150 MWBuilt Ferrybridge B 132kV Substation
National Grid (England & Wales)
Wilton Lion BESS
Battery storage · Sembcorp (Wilton BESS) Limited
150 MWBuilt Greystones A 275kV Substation
National Grid (England & Wales)
Capenhurst 275KV Substation
Battery storage · Zenobe Capenhurst Limited
100 MWBuilt Capenhurst 275kV Substation
National Grid (England & Wales)
Lakeside Energy Drax
Battery storage · Lakeside Energy Storage Limited
100 MWBuilt Drax 132kV Substation
National Grid (England & Wales)
KXP Immingham
Battery storage · Kxp Immingham Limited
80 MWBuilt Grimsby West 400/132 GSP
National Grid (England & Wales)
Capenhurst Tertiary Connection
Battery storage · Hd888Cap Limited
57 MWBuilt Capenhurst 275kV Substation
National Grid (England & Wales)
Bustleholme
Battery storage · Pivoted Power LLP
57 MWBuilt Bustleholm GSP
National Grid (England & Wales)
Enderby (Akira)
Battery storage · Enderby Battery Storage Limited
57 MWBuilt Enderby 400kV Substation
National Grid (England & Wales)
Native River (Capenhurst)
Battery storage · Native River Ltd
57 MWBuilt Capenhurst 275kV Substation
National Grid (England & Wales)
Monk Fryston Tertiary Connection
Battery storage · HD777FRY LTD
57 MWBuilt Monk Fryston 275kV Substation
National Grid (England & Wales)
Ocker Hill Tertiary Connection
Battery storage · HD143OCK LTD
57 MWBuilt Ocker Hill 275kV Substation
National Grid (England & Wales)
Sizing John (Rainhill)
Battery storage · Sizing John Limited
57 MWBuilt Rainhill GSP
National Grid (England & Wales)
Whitegate Tertiary Connection
Battery storage · HD144WHI LTD
57 MWBuilt Whitegate 275kV Substation
National Grid (England & Wales)
Richborough 1
Battery storage · Richborough Energy Park Limited
50 MWBuilt Richborough 400kV Substation
National Grid (England & Wales)
Richborough 2
Battery storage · Richborough Energy Park Limited
50 MWBuilt Richborough 400kV Substation
National Grid (England & Wales)
Bredbury
Battery storage · Pivoted Power LLP
50 MWBuilt Bredbury 275kV Substation
National Grid (England & Wales)
Brook Farm BESS
Battery storage · Care Power (Brook Farm) Limited
50 MWBuilt Bramford 132kV
National Grid (England & Wales)
Care Brentwood BEGA
Battery storage · Care Power (Brentwood) Limited
50 MWBuilt Warley GSP
National Grid (England & Wales)
Care Power Berkeley BEGA
Battery storage · Care Power (Berkeley) Limited
50 MWBuilt Severn Connection Node A 132kV Substation
National Grid (England & Wales)
Care Wolverhampton BEGA
Battery storage · Care Power (Wolverhampton) Limited
50 MWBuilt Penn GSP
National Grid (England & Wales)
Cowley
Battery storage · Pivoted Power LLP
50 MWBuilt Cowley 400kV Substation
National Grid (England & Wales)
Kemsley
Battery storage · Pivoted Power LLP
50 MWBuilt Kemsley 400kV Substation
National Grid (England & Wales)
Newtonwood BESS
Battery storage · Care Power (Newtonwood) Limited
50 MWBuilt Chesterfield GSP
National Grid (England & Wales)
Nursling Tertiary
Battery storage · Nursling Energy Two Limited
50 MWBuilt Nursling 400kV Substation
National Grid (England & Wales)
Pillswood BESS Phase 1
Battery storage · Heit Pw Limited
50 MWBuilt Creyke Beck GSP
National Grid (England & Wales)
Pillswood BESS Phase 2
Battery storage · Heit Pw2 Limited
50 MWBuilt Creyke Beck GSP
National Grid (England & Wales)
Steel Point (aka Project Lithium)
Battery storage · Skelmersdale Energy Storage Limited
50 MWBuilt Washway Farm GSP
National Grid (England & Wales)
Weirs Drove
Battery storage · Care Power (Burwell 1) Limited
50 MWBuilt Burwell 132kV Substation
National Grid (England & Wales)
Bumpers Farm BESS phase 1
Battery storage · Harmony BF Ltd
50 MWBuilt Amersham Main 132kV Substation
National Grid (England & Wales)
Bumpers Farm BESS phase 2
Battery storage · Harmony BF Ltd
50 MWBuilt Amersham Main 132kV Substation
National Grid (England & Wales)
Chapel Farm Battery Storage Project
Battery storage · Harmony Cf Limited
50 MWBuilt Sundon GSP
National Grid (England & Wales)
Clay Tye Farm Phase 1
Battery storage · Harmony Ctf Limited
50 MWBuilt Warley 132kV Substation
National Grid (England & Wales)
Clay Tye Farm Phase 2
Battery storage · Harmony CTF 2 Limited
50 MWBuilt Warley 132kV Substation
National Grid (England & Wales)
Tollgate 49.5MW BESS
Battery storage · Tollgate Energy Storage Limited
50 MWBuilt Hatfield 33kV Substation
National Grid (England & Wales)
Roosecote
Battery storage · Cbs Energy Storage Assets UK Limited
49 MWBuilt Roosecote 132kV Substation
National Grid (England & Wales)
Bloxwich
Battery storage · Bloxwich Energy Storage Limited
41 MWBuilt Bustleholm 132kV Substation
National Grid (England & Wales)
Clayhill Farm
Battery storage · Arl O09 Limited
40 MWBuilt Sundon GSP
National Grid (England & Wales)
Hunningley Stairfoot BESS
Battery storage · Care Power (Barnsley) Limited
40 MWBuilt Hunningley 132kV Substation
National Grid (England & Wales)
Page 1 of 2

Sources: NESO Transmission Entry Capacity (TEC) register and interconnector register (downloaded 8 November 2026); NESO Clean Power 2030 network map (existing and planned circuits, substations and network projects); National Grid Electricity Transmission overhead line routes. Contains data from NESO, licensed under the NESO Open Data Licence, and National Grid open data. Projects are placed at their connection substation, not the generating site; projects at new, unnamed “connection nodes” are listed but not mapped.