Hunningley Stairfoot BESS is a 40 MW battery storage project built and connected, connecting to the National Grid (England & Wales) network at Hunningley 132kV Substation. The connection agreement is held by Care Power (Barnsley) Limited.

Project stageOperating
  1. Planning (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. Operating (current stage)
  5. Closed (not yet reached)

Connection details

NESO project number
PRO-001887
Customer
Care Power (Barnsley) Limited
Technology
Energy Storage System
Total capacity
40 MW
Already connected
40 MW
Connection site
Hunningley 132kV Substation
Transmission owner
National Grid (England & Wales)
Connection type
Embedded (connects through the local distribution network)
NESO project status
Built

Connection site

The connection site could not be placed on the map.

Projects connecting near Hunningley Β· Grid map

Source: NESO Transmission Entry Capacity (TEC) register, downloaded 8 November 2026. Contains data from NESO, licensed under the NESO Open Data Licence. Report a problem